Custom hillside home · Encino Hills
5,200 sq ft · $2.3M contract · 18-month build
- Lot
- Encino Hills, south of Ventura Blvd. VHFHSZ + Baseline Hillside Ordinance overlays.
- Preconstruction
- Soils, geo, and hillside foundation re-engineering completed before plan-check submittal.
- Permits cleared
- LADBS plan check, hillside ordinance grading review, and protected-oak arborist review.
- Timeline
- 18 months from groundbreak to certificate of occupancy.
- Budget delta
- Final contract within 2.1% of preconstruction budget.
For context: a full renovation at $500K in a flat-lot Studio City home looks like the same level of design discipline and permit care, scoped within the existing footprint. The work changes; the process doesn’t.